Program Analyst (Earned Value Management) Job in Saint Louis, MO

Vacancy No. DCMA-POSF-27-13100310-IMP Department Defense Contract Management Agency
Salary $91,779.00 to $119,315.00 Grade 12 to 12
Perm/Temp Permanent FT/PT Full-time
Open Date 10/28/2026 Close Date 11/6/2026
Job Link Apply Online Who may apply Status Candidates
Locations:
Saint Louis, MO


Program Analyst (Earned Value Management)

Department of Defense
Defense Contract Management Agency
DCMA Geographic & Systems Support (PO)

Summary

See below for important information regarding this job.

Additional vacancies may be filled from this announcement.

Duties

  • Develops, documents, and defends independent forecasts for projects' final costs (Estimates at Completion - EACs) and completion dates (Estimated Completion Dates - ECDs).
  • Analyzes contractor Earned Value Management (EVM) data to evaluate performance, identify significant cost and schedule variances, and determine the root causes of performance issues.
  • Conducts ongoing surveillance to ensure contractor data deliverables meet all contractual requirements and data-item descriptions (DIDs), issuing Corrective Action Requests (CARs) as necessary.
  • Assesses and integrates program risks by analyzing their potential impacts on cost and schedule and integrating those findings into performance forecasts and recommendations.
  • Prepares and presents clear, actionable reports and briefings on program status, performance trends, and risk-informed forecasts to leadership and government program offices.

Requirements

Conditions of employment

  • Must be a U.S. citizen
  • Security Requirements: Secret
  • Appointment is subject to the completion of a favorable suitability or fitness determination, where reciprocity cannot be applied; unfavorably adjudicated background checks will be grounds for removal.
  • Selective Service Requirement: Males born after 12-31-59 must be registered or exempt from Selective Service.

Qualifications

To qualify for a Program Analyst (Earned Value Management), your resume and supporting documentation must support:

Specialized Experience: One year of specialized experience that equipped you with the particular competencies to successfully perform the duties of the position and is directly in or related to this position. To qualify at the GS-12 level, applicants must possess one year of specialized experience equivalent to the GS-11 level or equivalent under other pay systems in the Federal service, military or private sector. Applicants must meet eligibility requirements including time-in-grade (General Schedule (GS) positions only), time-after-competitive appointment, minimum qualifications, and any other regulatory requirements by the cut-off/closing date of the announcement. Creditable
specialized experience includes:

  • Analyzing a project schedule to evaluate its critical path and forecast a project's completion date (Estimated Completion Date - ECD).
  • Evaluating contractor performance data to identify the root cause of cost and schedule variances.
  • Identifying program risks and assessing their potential impact on project cost and schedule.
  • Ensuring contractor data deliverables comply with contractual requirements, such as a Statement of Work or a Contract Data Requirements List (CDRL).

Education

Substitution of education may not be used in lieu of specialized experience for this grade level.

Additional information

  • This position does not meet criteria for appointment of Reemployed Annuitants. The DoD criteria for hiring Reemployed Annuitants can be found at: DoDI 1400.25-V300.
  • Tour of Duty: 1st Shift
  • FLSA:Exempt/Non-Exempt
  • Bargaining Unit: No
  • Selectee may be required to serve a trial/probationary period.
  • Acquisition, Technology & Logistics (AT&L) NON-CAP: Position requires DoD Acquisition Business-Financial Management, Practitioner certification within required timeframes. Selectee must also achieve 80 hours of Continuous Learning Points (CLPs) every 2-years. Click here for more details and Resources.
  • Military spouses working remotely are exempt from in-person work under the conditions explained by OPM's February 12, 2025 memorandum and the March 20, 2025 Frequently Asked Questions.

Candidates should be committed to improving the efficiency of the Federal government, passionate about the ideals of our American republic, and committed to upholding the rule of law and the United States Constitution.

A career with the U.S. government provides employees with a comprehensive benefits package. As a federal employee, you and your family will have access to a range of benefits that are designed to make your federal career very rewarding. Opens in a new windowLearn more about federal benefits.

Review our benefits

Eligibility for benefits depends on the type of position you hold and whether your position is full-time, part-time or intermittent. Contact the hiring agency for more information on the specific benefits offered.

How you will be evaluated

You will be evaluated for this job based on how well you meet the qualifications above.

The assessments for this job will measure the following Competencies:

  • Accountability
  • Attention to Detail
  • Customer Service
  • Decision Making
  • Flexibility
  • Influencing/Negotiating
  • Integrity/Honesty
  • Interpersonal Skills
  • Learning
  • Reading Comprehension
  • Reasoning
  • Self-Management
  • Stress Tolerance
  • Teamwork


Please follow all instructions carefully. Errors or omissions may affect your eligibility and/or score.

Once the application process is complete, a manual review of your resume and supporting documentation will occur to determine if you are eligible and among the best qualified as determined by the predetermined cutoff score. Your score is based on your responses to the assessment questionnaire.

If you meet the minimum qualifications of this position, you may be presented with instructions on how to access the USA Hire Assessment. This additional online assessment is required and must be completed within 48 hours of submitting your application (which may be prior to the closing date of this announcement), unless you have requested Reasonable Accommodation for the USA Hire Competency Based Assessments. Your results will be kept on record for one year when applying for future jobs that require the same USA Hire Competency Based Assessments.

Required Documents

Required documents for submission vary based on the authority you are using to apply (e.g., applying as a veteran, a current permanent Federal employee, a reinstatement, etc). Your complete application includes your resume, your responses to the online questionnaire, and documents which prove your eligibility to apply. If you fail to provide these documents, you will be marked as having an incomplete application package and you will not be considered any further.

The following documents are REQUIRED:
1. Your resume:

  • IMPORTANT UPDATE: Your resume must not exceed two (2) pages. If your resume exceeds the two-page limit, you will be removed from consideration for this announcement. The resume and required supporting documentation should provide the minimum qualifications and relevant experience for the announced position. Must include the work schedule, hours worked per week, dates of employment, and duties performed. If multiple resumes are submitted by an applicant, only the last resume submitted will be reviewed for qualifications and referred for selection consideration, if eligible. The resume must not be more than 5MB and should be saved and uploaded as a PDF to maintain formatting and number of pages. We also accept GIF, JPG, JPEG, PNG, RTF, TXT, PDF, ODT or Word (DOC or DOCX). We do not accept PDF portfolio files. Page margins should be 0.5 inches, and font styles must be legible. Consider using 14-point size font for titles and 10-point for the main text. We recommend using a font like Lato, if available. Other widely available options are Calibri, Helvetica, Arial, Verdana, Open San Source Sans Pro, Roboto or Noro Sans.
  • Additional guidance on writing a federal resume can be found at: USAJOBS Help Center - How do I write a resume for a federal job? The resume builder can help you create a resume using these recommendations and uses the information in your USAJOBS profile to help you get started.
  • To ensure full credit for time worked regarding qualifications determinations your resume must include your work schedule. You are strongly encouraged to ensure your resume contains the number of hours worked per week and the specific dates of employment (i.e.,"40 hrs per week; 1/15/2020 - 1/14/2022" or "30 hrs per week; 1/15/2020 - Present").
2. Veteran's Documents: 3. Current Federal Employees:
  • You must provide a SF-50 (most current Gen Adj or WGI actions are best), or other equivalent official "Notification of Personnel Action" (Note: Request for Personnel Action (SF-52) is NOT acceptable.) Your SF-50 must reflect Tenure (Block 24) and Position Occupied (Block 34).
  • Time-in-grade documentation: For current federal employees, or individuals who have served in a General Schedule (GS) graded position in the previous 52 weeks, your application must demonstrate you have met the one year time-in-grade requirement by the closing date of this announcement.

Please review the link for ICTAP, ALL PPP ELIGIBILITIES AND OTHER SUPPORTING DOCUMENTS needed for proof of eligibility: Supporting Document.

If you are relying on your education to meet qualification requirements:

Education must be accredited by an accrediting institution recognized by the U.S. Department of Education in order for it to be credited towards qualifications. Therefore, provide only the attendance and/or degrees from schools accredited by accrediting institutions recognized by the U.S. Department of Education.

Failure to provide all of the required information as stated in this vacancy announcement may result in an ineligible rating or may affect the overall rating.

How to Apply

To apply for this position, you must complete the online questionnaire and submit the documentation specified in the Required Documents section above.

To preview the questionnaire, please go to https://apply.usastaffing.gov/ViewQuestionnaire/13100310.

The complete application package must be submitted by 11:59 PM (EST) on 11/06/2026 to receive consideration.

  • To begin, click Apply Online to access an online application. Follow the prompts to select your USAJOBS resume and/or other supporting documents. You will need to be logged into your USAJOBS account or you may need to create a new account.
  • You will be taken to an online application. Complete the online application, verify the required documentation, and submit the application. NOTE: Resumes up to a total of two pages will be accepted. Resumes exceeding two pages will be removed from consideration.
  • You will receive an email notification when your application has been received for the announcement.
  • If you are required to complete any USA Hire Assessments, you will be notified after submitting your application. The notification will be provided in your application submission screen and via email. The notification will include your unique assessment access link to the USA Hire system and the completion deadline. Additionally, in USAJOBS you can click "Track this application" to return to your assessment completion notice.
  • Access USA Hire using your unique assessment link. Access is granted through your USAJOBS login credentials.
  • Review all instructions prior to beginning your assessments. You will have the opportunity to request a testing accommodation before beginning the assessments should you have a disability covered under the Rehabilitation Act of 1973 as amended.
  • Set aside at least 3 hours to take the USA Hire Assessments; however, most applicants complete the assessments in less time. If you need to stop the assessments and continue later, you can re-use your unique assessment link.
  • Your responses to the USA Hire Assessments will be reused for one year (in most cases) from the date you complete an assessment. If future applications you submit require completion of the same assessments, your responses will be automatically reused.
  • Visit the USA Hire Applicant Resource Center for practice assessments and assessment preparation resources at https://support-usahire.opm.gov/hc/en-us.
  • To verify the status of your application, log into your USAJOBS account, https://www.usajobs.gov, select the Application Status link and then select the More Information link for this position. The Application Status page will display the status of your application, the documentation received and processed, and your responses submitted to the online application. Your uploaded documents may take several hours to clear the virus scan process.
As required by 5 C.F.R. § 302.106., DLA will provide Section 508 conformant ICT to employees with disabilities. All ICT interfaces with the public related to vacancy announcements and career transition opportunities must conform to the applicable requirements in the current ICT Standards and Guidelines (36 C.F.R. § 1194).

Agency contact information

DHRSStaffing DCMA Central
Phone
614 693-6765
Email
DHRSStaffing.DCMA.Central@dla.mil
Address
DEFENSE CONTRACT MGT - GSS SYS - PO
3901 A Ave
Bldg 10500
Fort Lee, VA 23801
US

Next steps

Once your online application is submitted you will receive a confirmation notification by email. Your application will be evaluated by the Human Resources Office to determine your eligibility and qualifications for the position. After the evaluation is complete, you will receive another notification regarding the status of your application.

To verify the status of your application, log into your USAJOBS account (https://my.usajobs.gov/Account/Login), all of your applications will appear on the Welcome screen. The Application Status will appear along with the date your application was last updated. For information on what each Application Status means, visit:https://www.usajobs.gov/Help/how-to/application/status/

Defense Contract Management Agency

Join Team DCMA -- Challenge yourself!

We are the independent eyes and ears of DoD and its partners, enhancing warfighter lethality by ensuring timely delivery of quality products, and providing relevant acquisition insight supporting affordability and readiness.

Agency contact information

DHRSStaffing DCMA Central
Phone
614 693-6765
Email
DHRSStaffing.DCMA.Central@dla.mil
Address
DEFENSE CONTRACT MGT - GSS SYS - PO
3901 A Ave
Bldg 10500
Fort Lee, VA 23801
US

Visit our careers page

Learn more about what it's like to work at Defense Contract Management Agency, what the agency does, and about the types of careers this agency offers.

http://www.dcma.mil