Project Scheduler (Temporary) Job in Washington, DC

Vacancy No. OCE-2026-216 Department Architect of the Capitol
Salary $121,785.00 to $158,322.00 Grade 13 to Fu
Perm/Temp Temporary FT/PT Full-time
Open Date 6/5/2026 Close Date 6/23/2026
Job Link Apply Online Who may apply Public
Locations:
Washington, DC


Summary

This position is located in the Architect of the Capitol, Office of the Chief Engineer. The selectee will be responsible for developing, reviewing, monitoring and analyzing planning, design and construction schedules on a broad range of building projects during programming, planning, design and construction phases.

This job is open to

The public

U.S. Citizens, Nationals or those who owe allegiance to the U.S.

Clarification from the agency

See Requirements section of this announcement for information on who may apply.

Duties

The individual selected for this position will perform the following:

Construction Project Scheduling, Oversight and/or Coordination

Coordinates and integrates the planning, programming, development, oversight, scheduling and overall management of resources for multi-phase projects.

Consults with project personnel to help ensure a progress schedule is maintained and takes remedial action to ensure the proper relationship between work efforts and schedule compliance.

Reviews resources estimates to ensure proper distribution of project resources.

Keeps abreast of changes and cost variations from design through construction and installation to ensure completion on time and within the designated budget.

Resolves difficult project control issues.

Performs additional data systems and analysis work.

Reviews cost loaded Critical Path Method (CPM) schedule updates for invoice amounts and ensures contract costs are precisely accounted for.

Maintains all construction updates in the Primavera database for archival purposes and forensic analysis.

Multi-phase Projects

Analyzes and defines the requirements of multi-phase projects.

Participates in the development of requirements with project managers, analyzes requirements and design criteria, reviews cost estimates, ensures validation of requirements and evaluates schedules and the feasibility of project accomplishment.

Determines specification practicability for complex or costly construction projects.

As a construction technical representative, performs construction management duties directed toward the development, procurement, fabrication, installation and acceptance of completed construction projects.

Technical Construction Schedule Advice and Guidance

Confers and consults with management and planning personnel in preparing requirements and criteria for the most complex or high value projects for construction or modification of facilities, systems, equipment or hardware.

Serves as a resource to project engineers to improve planning, design and construction, reduce contract changes, to help maintain production schedules and enhance future operations.

Determines critical project issues and recommends corrective actions.

Develops guides for contract provisions related to overall schedule reporting systems and other documents.

Acts as a primary contact with associate scheduling support firms retained by the AOC.

Contractor Oversight

Serves as senior construction representative, performing design and construction reviews and providing technical assistance and other engineering expertise in the construction of facilities, systems or equipment.

Plans and technically directs the efforts of an engineering support contractor engaged in performing surveillance of construction or installation work of other contractors.

Provides for and/or performs surveillance and inspections of contractors' on-site or off-site work for purposes of verifying conformance to approved schedules.

Serves as a Contracting Officer's Technical Representative (COTR), assisting project managers, guiding and evaluating contractor efforts and assessing technical progress in relation to the established schedule and resources allotted.

Ensures that the entire scope of the work is performed in accordance with the construction schedule and that all quality requirements placed on the construction/installation contractor are strictly enforced related to the construction schedule.

Performs a continuing audit of scheduling procedures, field operations, system verification tests and site activation to ensure that activities in assigned areas meet mission test support requirements.

Reviews completed work, evaluates quality and recommends acceptance or rejection of completed work to the Contracting Officer prior to any payment.

Requirements

Conditions of employment

  • You must be able to pass a drug test.
  • Your resume and question responses must demonstrate the job-related KSAs.
  • You must meet the definition of specialized experience.

To be employed by the Architect of the Capitol in a paid position, an individual must meet one of the categories below:

  • A citizen of the United States;
  • A person who is lawfully admitted for permanent residence and is seeking citizenship as outlined in 8 U.S.C. 1324b(a)(3)(B);
  • A person who is admitted as a refugee under 8 U.S.C. 1157 or is granted asylum under 8 U.S.C. 1158 and has filed a declaration of intention to become a lawful permanent resident and then a citizen when eligible;
  • A person who owes allegiance to the United States (nationals of American Samoa, Swains Island, and the Northern Mariana Islands, and nationals who meet other requirements described in 8 U.S.C. 1408); or
  • A person who is currently an officer or employee of the Government of the United States.

Qualifications

You must meet the United States Office of Personnel Management's (OPM) qualification requirements (including specialized experience and/or educational requirements) for the advertised position.  You must meet all eligibility and qualifications requirements by the closing date of the job announcement.  Additional information on the qualification requirements is outlined in the OPM Qualifications Standards Handbook of General Schedule Positions.  It is available for your review on the OPM web site at OPM qualification standards
 
Specialized experience: is experience that has equipped you with the particular knowledge, skills and abilities to perform successfully the duties of the position, and that is typically in or related to the position to be filled.  To be creditable, specialized experience must have been equivalent to at least the next lower grade level.
 
Candidates for the GS-13 grade level must have at least 52 weeks of specialized experience equivalent to the next lower (GS-12) grade level in the Federal service. 

Specialized experience is defined as the following:

  • Working with project managers, engineers, and construction personnel to develop, review, monitor, analyze design, and maintain construction schedules for building projects.

  • Serving as a Contracting Officer's Technical Representative (COTR) or equivalent for construction project contracts.

  • Using Oracle Primavera and Microsoft Projects to perform various project scheduling activities for multi-phase construction projects.

Education

No education substitution.

Additional information

Welcome Veterans. The Veterans Employment Opportunities Act of 1998 (VEOA) gives veterans' preference rights in the legislative branch to certain veterans as applied by the Congressional Accountability Act. Veterans' preference is applied on this vacancy announcement. If you are a veteran and have been separated under honorable conditions, you must submit a copy of your DD-214 or other proof of eligibility; SF-15, if applicable; and Department of Veterans Affairs documentation of disability, if applicable. For more information, please visit OPM vet guide

If you are a male applicant born after December 31, 1959, you must certify that you have registered with the Selective Service System.  If you are exempt from registration under Selective Service Law, you must provide appropriate proof of exemption. Please visit the Selective Service System website for more information.
 
DRUG TESTING: The Architect of the Capitol (AOC) is a Drug Free Workplace. As part of the AOC’s suitability assessment, a candidate tentatively selected for a position who is not currently an AOC employee is required to submit to screening for illegal drug use. Satisfactory completion of a drug test is a condition of employment with the Agency. A candidate must test negative prior to being eligible for appointment into a position. We will schedule, provide, and cover the cost for the drug test.
 
The selectee(s) under the vacancy announcement for this position is subject to a criminal record check by the U.S. Capitol Police and satisfactory adjudication to be eligible for employment at the Architect of the Capitol.
 
The Architect of the Capitol is an E-VERIFY Participant. E-VERIFY is an Internet-based system that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security (DHS) and Social Security Administration records to confirm employment authorization in the United States. If you are selected for this position, the documentation that you present for purposes of completing the DHS Form I-9 will be verified through the DHS "E-VERIFY" electronic system. For more information on E-Verify, please visit http://www.dhs.gov/files/programs/gc_1185221678150.shtm
 
The Architect of the Capitol is an Equal Opportunity Employer and prohibits discrimination on the basis of race, color, sex, religion, age, national origin, genetic information, sexual orientation and/or disability.

This agency provides reasonable accommodation to applicants with disabilities. If you need a reasonable accommodation for any part of the application and hiring process, please notify the agency. The decision on granting reasonable accommodation will be on a case-by-case basis.
 
Moving expenses are not authorized.
 
Relocation expenses are not authorized.
 
Probationary Period- A newly appointed selectee(s) is subject to the completion of a one-year trial/probationary period, regardless of whether or not a trial/probationary period has been completed previously with the Architect of the Capitol or another Federal agency.

This vacancy announcement may be used to fill additional vacancies in any of the jurisdictions of the Architect of the Capitol.
All application materials become the property of the Architect of the Capitol.

Note:  Please be advised that federal retired annuitant candidates may only be considered as a temporary employee if the role can be filled in that capacity.

Candidates should be committed to improving the efficiency of the Federal government, passionate about the ideals of our American republic, and committed to upholding the rule of law and the United States Constitution.

A career with the U.S. government provides employees with a comprehensive benefits package. As a federal employee, you and your family will have access to a range of benefits that are designed to make your federal career very rewarding. Opens in a new windowLearn more about federal benefits.

A variety of health insurance plans; retirement system with investment options; paid holidays; paid sick and annual (vacation) leave; life insurance; incentive systems; subsidized transportation; training and development opportunities, etc.

The Architect of the Capitol offers eligible employees opportunity to participate in the Student Loan Repayment Program.

Eligibility for benefits depends on the type of position you hold and whether your position is full-time, part-time or intermittent. Contact the hiring agency for more information on the specific benefits offered.

How you will be evaluated

You will be evaluated for this job based on how well you meet the qualifications above.

Review your resume and responses carefully. Your eligibility for consideration and qualifications for the position will be determined based upon a review of your detailed resume and your responses to job specific self-assessment questions. 

Your resume will be evaluated based on evidence of your ability to demonstrate the knowledge, skills, and abilities (KSAs) for this position, possession of any specialized experience, and how well your background and experience relates to the self-assessment questions in the job announcement. The self-assessment questions relate to the following knowledge, skills, abilities, and competencies:
 
-- Knowledge of Critical Path Method (CPM) scheduling

-- Knowledge of project scheduling software

-- Knowledge of construction procedures and practices, materials and equipment to design

-- Contract Administration

-- Ability to communicate effectively in writing.

-- Ability to communicate effectively orally.

Your responses to the self assessment questions serve as the basis for your initial rating. You will receive a numerical score based on your responses to these questions. Next, your responses will be evaluated by a Human Resources Specialist and/or a subject matter expert against the information provided in your resume and optional cover letter. Your resume must support your answers to the self assessment questions. Falsifying your background, education, and/or experience is cause for not hiring you or disqualification for further consideration. 

Please note that a complete application is required for consideration. (Please review the “Required Documents” section of this job announcement to see what must be included in a complete application).


You may preview questions for this vacancy.

Required Documents

The Architect of the Capitol's (AOC) job application process is designed to ensure you only provide information necessary to evaluate your qualifications and eligibility for the position vacancy.

To apply for this position, you only need to submit: a) your resume and b) answers to the online vacancy assessment questionnaire. The online questionnaire contains eligibility and screening questions and other relevant information. No additional documentation or attachments are required at the time of application.

Your resume should list your education, training and work experience including job titles, employment dates, duties and accomplishments.

Nothing further is required until it is requested by AOC’s Human Capital Management Division. If additional documentation is required for the position, you will be asked to provide it during the interview or selection process. At that time, you may be asked to submit documentation to support statements made in your resume.

For example, you may be asked to provide a copy of your diploma, college transcripts, or proof of Federal employment status. If the position requires licensure or certification, you will be asked to provide proof at the time of selection.

If Veterans’ preference is claimed, you will be asked to submit proof (DD-214, and, if claiming a 10-point preference, a SF-15 and the proof required by that form).

Failure to provide the required documents will end further consideration and/or result in the withdrawal of any tentative job offers.

If you are relying on your education to meet qualification requirements:

Education must be accredited by an accrediting institution recognized by the U.S. Department of Education in order for it to be credited towards qualifications. Therefore, provide only the attendance and/or degrees from schools accredited by accrediting institutions recognized by the U.S. Department of Education.

Failure to provide all of the required information as stated in this vacancy announcement may result in an ineligible rating or may affect the overall rating.

How to Apply

You MUST apply online. FORMS RECEIVED BY FAX, EMAIL OR U.S. POSTAL SERVICE DELIVERY WILL NOT BE ACCEPTED.

If you are a new user to the USAJobs Site and have never registered for an account; you will first need to create an account profile with your basic contact information and a resume to begin applying.  You must be a registered USAJobs user AND you must be signed-in to your account in order to apply for this position.  For help setting up an account or for general help using USAJobs, go to USAJobs Help Page.
 
NEED HELP?
If you experience any difficulties with the application site, help is available!  If you have problems completing your on-line application, contact the Monster Hiring Management Help Desk at 1-866-656-6831 or by e-mail at MGSHELP@monster.com. The help desk is available Monday - Friday 7:00 a.m. to 7:00 p.m. Eastern Time.  You may call and leave a voice mail message at all other times. 

All required supporting documents will be collected electronically via the USAJobs “Saved Documents” feature.

If you are unable to apply on-line, you may visit our Employment Center for technical assistance in entering your application. The Employment Center is located at 441 Second & D Streets S.W., Washington, D.C., Room H2-178, and is open Monday through Friday from 8:00 a.m. to 4:00 p.m. You may call (202) 226-7000 for directions.

Agency contact information

Nyika Hinson
Phone
202-226-7000
Email
nyika.hinson@aoc.gov
Address
Architect of the Capitol
United States Capitol
Washington, District of Columbia 20515
United States

Next steps

You will receive a notice generated by the USAJobs System when you have successfully submitted your application.  We will review your application and transcript(s) (if you are qualifying based on education) to ensure you meet the basic qualification requirements.  
 
You can check the status of your application by logging into http://www.usajobs.gov.  You may also sign up to receive automatic emails anytime the status of your application has changed by logging into your USAJobs Account, editing your profile and changing the ‘Notification Settings’ to indicate that you want to be notified by email when the status changes.  Information regarding the status of your application should be updated in the system within 2 weeks after the closing date of this job announcement.

Architect of the Capitol

The mission of the Architect of the Capitol (AOC) is to serve Congress and the Supreme Court, preserve America's Capitol and inspire memorable experiences. The AOC is responsible for the maintenance, operation, development and preservation of 18.4 million square feet of buildings and more than 570 acres of land throughout Capitol Hill. The AOC provides a welcoming and educational environment for millions of visitors through the U.S. Capitol Visitor Center and the US Botanic Garden. Learn more at https://www.aoc.gov/careers.  The AOC prides itself on its Core Values of Respect, Integrity, Safety and Empower (RISE).

Agency contact information

Nyika Hinson
Phone
202-226-7000
Email
nyika.hinson@aoc.gov
Address
Architect of the Capitol
United States Capitol
Washington, District of Columbia 20515
United States